Testing Emergency Showers

Keep your equipment fit. Make sure that spray patterns, flow pressure etc. always comply with standards.

Phase 1
We are checking:

  • Marking/signs
  • Free space
  • Installation height
  • Flow test
  • Valve
  • Flowrate of water (60l/min)
  • Water distribution
  • Safety

 

Phase 2
Emptying of test Trolley

  • Emptying the water in the sink with support from the pump
  • Emptying the water in the drain with support from the valve

 

Phase 3
Test of Eye shower

We are checking:

  • Marking/signs
  • Free space
  • Installation height
  • Flow test
  • Valve
  • Flowrate of water (6 l/min per eye)
  • Water distribution
  • Safety

 

Phase 4
Test of Eye shower

We are checking:

  • Jet height